PLAN REVIEW, INSPECTION, AND PROJECT MANAGEMENT SERVICES FOR DEVELOPER POTABLE AND RECYCLED WATER PROJECTS

  • slide0
  • slide1

Description

  • Improvement Plans Review
  • Recycled Water Plan Review
  • Post Meter Inspection
  • Coverage Tests
  • Shutdown Tests
  • Title 22 Engineering Report

Project details

  • Client : Otay Water District
  • Location : San Diego, CA

AegisEM was selected by the Otay Water District to provide professional engineering services to support the District’s developer projects. Tasks include the review of improvement plans submitted by developer’s engineer for conformance with the Water Agency Specifications; review of recycled water irrigation plans for conformance with the District and the County of San Diego Department of Environmental Health standards; and inspection services for existing (retrofit) or proposed irrigation systems.

Aegis EM also prepared Title 22 Engineering Reports and shutdown testing protocols for homeowner’s association sites that were converted to recycled water.